As soon as AC power is applied to the fixture, the unit will automatically initiate a self-test and self-diagnostic test as follows:
1. Verifies battery connection, checks for charger board failure, lamp failure and transformer failure every 5 seconds.
2. 1-minute self-test every 30 days.
3. 30-minute self-test on the 6th month of the year after installation.
4. 90-minute self-test on the 12th month of the year after installation.
5. Factore pre-set functions - does not require field adjustment.
NOTE: The internal clock resets every time AC power fails or test switch is depressed. |